Removal Procedure
Tools Required
| • | J 8092 
 Universal Driver
Handle - 3/4 in - 10 | 
| • | J 23907 
 Slide Hammer
with Bearing Adapter | 
| • | J 29369-2 
 Bushing
and Bearing Remover 2-3 in | 
 
- Remove the reaction carrier shaft/internal gear retainer (668) and the reaction
carrier shaft (666) from the input internal gear (664).
- Inspect the reaction carrier shaft (666) and the input internal gear (664)
for the following defects:
| • | Damaged or worn bushings | 
 
- Using
J 29369-2 
 with 
J 23907 
 , remove the reaction carrier shaft front bushing
(665).
 
- Using
J 25019-14 
 with 
J 7004-A 
 , remove the reaction carrier shaft rear bushing
(667).
Installation Procedure
 
- Using J 34196-3 which is part of kit 
J 34196-B 
 with 
J 8092 
 ,
install a new reaction carrier shaft front bushing (665).
 
- Using
J 34196-3 which is part of kit 
J 34196-B 
 with 
J 8092 
 , install
a reaction carrier shaft rear bushing (667).